SPECWORK

Specifications that people can hold in their hands.

SPECWORK is where TCIEG does its open specification work: reviewing drafts, building reference implementations, and carrying the results into the standards bodies that need them. The first community under SPECWORK is the ANCR Extension for ISO/IEC TS 27560:2023, a notice receipt profile that puts controller identification and machine readable notice before any identification of the individual.

Why TCIEG does this

The positions we argue for

Every TCIEG publication comes back to the same points. A person should be able to identify the party collecting their data before that party identifies them. People with no relationship to a controller, someone walking past a camera, should be able to find out who is collecting and object without logging into a website. A privacy policy should become a transparency policy: versioned, machine readable, and something a record can point at. And the evidence of a disclosure should be held by both sides, so a dispute is settled from records rather than recollection.

The ANCR extension is the first specification that makes all four of these testable in a record. Its conformance criteria include the sequence rule, anonymity by default, a public rule reference, and non-exclusion. That is why SPECWORK starts here.

Anchored Notice Receipt

ancr-notice-receipt-2.0
controller_identification_record_idcir_8b12…04aa
notice_version_referencev2026-09-07
presented_at2026-09-07T10:14:02Z
pii_principal_idnot required
privacy_access_pointoperable without login

Held by the person.

What SPECWORK does

Three kinds of work

Review

Consolidated comment sets against line numbered drafts, disposition tracking, and briefings for reviewers who are new to the text.

Build

Reference implementations and test beds for the artefacts a specification names, so the text is checked against running code before it is approved.

Carry

Liaison material and national body coordination for ISO/IEC JTC 1/SC 27/WG 5 and SC 44/WG 1, where TCIEG members hold editing and delegate roles.

How it relates to Kantara

Ownership and roles

The ANCR extension is a Kantara Initiative ANCR Working Group output, published under Kantara IPR terms, reciprocal royalty free with opt out to RAND. The working group approves releases and decides what goes to ISO/IEC. SPECWORK is a community programme run by TCIEG in support of that work. It brings implementers, regulators, delegates and researchers in, and it keeps the two bodies distinct: TCIEG does not own the specification and does not vote in the working group on its own behalf.

Where the work stands

November 2026

Release 1 of the extension, the v1.0 Release Candidate, was published on 7 September 2026 and is under Working Group review. Approval moves it toward a Kantara Recommendation and onward to SC 27/WG 5 as a liaison contribution under PWI 26689, and to ISO/IEC PWI 27138 in SC 44/WG 1, the Internet Transparency Code of Practice profile, as an implementation reference. The revision of ISO/IEC TS 27560:2023 is going forward to DIS. Working group calls run twice a month.

Take part

Join the ANCR extension work

Pick the route that fits you: build, review, regulate, delegate or research.

Find your route in